Enter your one-rep max — or estimate it from a recent set — and get every set of your next 5/3/1 cycle: warm-ups, working weights, AMRAP targets, and the deload week.
Three inputs produce your entire month of training: a max, a Training Max percentage, and the fixed 5/3/1 wave.
Enter your tested one-rep max, or a recent hard set of 2–10 reps and we estimate it (e1RM) as the average of the Brzycki and Epley formulas. An estimate from a solid triple or set of five is accurate enough for 5/3/1 — the program is deliberately not sensitive to a few kilos of error.
5/3/1 never programs off your true max. The Training Max (TM) is 85–90% of your 1RM, and every working percentage is calculated from it. Default is 90%, Wendler's standard recommendation; choose 85% if you are coming back from a break or your max is a guess.
The calculator lays out all four weeks — 5s, 3s, 5/3/1, then a deload — with the same 40/50/60% warm-up ramp before each session. Weights are rounded down to the nearest 2.5 kg or 5 lb so every set is loadable on a real bar, and the last set of weeks 1–3 is marked AMRAP.
Jim Wendler built 5/3/1 around a handful of ideas that look conservative on paper and are exactly why the program keeps working when more aggressive plans stall. Understanding them stops you from "fixing" the parts that make it effective.
Programming off 90% of your max means the prescribed weights are always weights you can actually lift, on a bad day, with good bar speed. That buffer is what lets you add weight cycle after cycle without grinding: your 1RM fluctuates daily with sleep, stress, and fatigue, but a Training Max at 85–90% stays under the worst-day ceiling. Lifters who inflate their TM get about three good weeks before every top set becomes a max attempt — which is precisely the situation 5/3/1 exists to avoid.
The fixed percentages are deliberately modest, so the last set of each week is where you earn progress: "5+", "3+", and "1+" mean you take the top weight for as many quality reps as you have that day. The AMRAP set does two jobs — it auto-regulates the stimulus (feeling strong: rep out; feeling flat: hit the minimum and go home) and it gives you a rep record to beat, which is a far more frequent and motivating measure of progress than a new 1RM.
Adding 2.5 kg to a press and 5 kg to a squat per month feels trivially small — until you multiply it by twelve cycles. The increments are sized so the program stays ahead of you for years instead of weeks. Racing the TM up faster than your actual strength grows is borrowing progress from future cycles, and the debt always comes due as missed reps.
When the minimum reps stop being there — you fail a prescribed 5/3/1 set, or the "1+" is a grinder with nothing behind it — you don't switch programs, you reset: drop the Training Max for that lift by about 10% (or recalculate from a recent AMRAP e1RM) and build back up. Lifts stall independently; reset only the one that stalled and let the others keep climbing.
Setting the Training Max too high
The most common way to break 5/3/1. If your TM is based on an inflated or ancient 1RM, the percentages stop being sub-maximal, bar speed dies, and AMRAP sets shrink to the minimum. Rule of thumb: you should be able to hit your TM for 3–5 clean reps any day of the week. When in doubt, choose 85% — starting too light costs you one cycle, starting too heavy costs you the program.
Skipping the deload week
Week 4 feels like a waste when you're motivated — that is exactly when accumulating fatigue is easiest to ignore. The deload keeps the pattern trained while letting recovery catch up, so the next cycle's heavier weights land on a fresh base. Skip it repeatedly and the missed reps show up around cycles three or four, right when the TM starts getting meaningful.
Grinding every AMRAP set to failure
AMRAP means as many quality reps as possible, not a weekly max-effort test. Leaving 1–2 reps in the tank still sets rep records and drives progress, without the recovery cost of grinding to absolute failure every week. Save genuinely emptying the tank for occasional big days — for instance the last 5/3/1 week before a reset.
Quitting after three weeks
5/3/1 is built around monthly increments, so a single cycle proves almost nothing. The visible payoff — rep records falling at weights that used to be your top sets — arrives over 3–6 cycles. Changing programs every few weeks resets that compounding to zero, which is why chronic program-hoppers rate every program as "not working".
Structured bodyweight workouts — no equipment, no gym. Delivered to your inbox in 30 seconds.
Arnie is a no-frills gym logbook built for barbell training: log your AMRAP reps, watch your estimated 1RM trend lift by lift, and know exactly when a Training Max bump is earned.